With our capabilities and collaboration with experienced international partners in renewable energy, VINTEG’s consultancy services deliver quality and satisfaction to investors.
Projects
VINTEG provides technical consulting services, executes specialized agreements with regulatory bodies to operationalize projects. Additionally, VINTEG possesses the capability to design, supply, and install monitoring and control systems for entire factories.
Solar Power Plant AMI Khanh Hoa - 50MWp
Solar Power Plants Solar Park- 4x50MWp
Solar Power Plant Cam Lam KN&VN- 2x50MWp
Solar Power Plant Xuan Tho 1,2- 2x50MWp
Solar Power Plant AMI BMT- 30MWp
Rooftop solar management system
Client: Ami Khanh Hoa Energy Joint Stock Company
Project: AMI Khanh Hoa Solar Power Plant
Capacity: 50MWp
Scope of work:
- Applying for an electricity activity license
- Establish operation coordination process, Troubleshooting process
- Preparation of shock power-up dossiers, first-time power-up dossiers
- COD Testing
- Prepare a dossier to apply for COD recognition
Location: Khanh Hoa province
Client: Hoan Cau Long An Group
Project: Solar Park Solar Power Plant Cluster 1,2,3,4 - 4x50MWp
Capacity: 4x50MWp
Scope of work:
- Applying for an electricity activity license
- Establish operation coordination process, Troubleshooting process
- Preparation of shock power-up dossiers, first-time power-up dossiers
- COD Testing
- Prepare a dossier to apply for COD recognition
Location: Long An province
Client: Cam Lam Solar Joint Stock Company & KN Cam Lam Solar Power Joint Stock Company
Project: Cam Lam KN&VN Solar Power Plant
Capacity: 2x50MW
Scope of work:
- Carry out procedures to obtain the certifications of the competent State Authority of the test results.
-Calculation of relay tuning parameters and device numbering
- Licensing of electricity activities
- Preparation of application documents and implementation of procedures for recognition of commercial operation date
- Prepare a dossier to check the conditions for plugging in the connection point, the agreement on the first plug-in shock plug-in of the unit, the agreement on the first plug-in of the unit, the program of the acceptance test run
-SCADA detailed agreement with CPC -Preparation of request documents and implementation of protection relay specification adjustment agreement procedures
-Adjusting the technical design and carrying out related procedures for the project
Location: Cam Lam Province
Client: Quang Phu Khanh Joint Stock Company
Project: Xuan Tho Solar Power Plant 1.2 - 2x50MWp
Capacity: 2x50 MWp
Scope of work:
- Apply for an electricity activity license
- Establish operation coordination process, Troubleshooting process
- Preparation of shock power-up dossiers, first-time power-up dossiers
- COD Testing
- Prepare a dossier to apply for COD recognition
Location: Phu Yen Province
Client: BMT Renewable Energy Joint Stock Company
Project: AMI BMT Solar Power Plant - 30MWp
Capacity: 30MWp
Scope of work:
- Consulting on setting up a 30MW BMT solar power plant
Location: Dak Lak Province
The explosive growth of solar power projects in recent years has caused widespread overload of lines. Rooftop solar power projects are partially or completely cut off, seriously affecting project investment efficiency.
To solve the above problem, VINTEG has researched and installed a trial of "Rooftop solar power control monitoring system" for 10 projects at Quang Nam Electricity for the purpose of remote monitoring and control of projects. rooftop solar power, limiting manual capacity cuts, reducing power output for investors, thereby limiting the impact of grid overload on the project's investment efficiency.
B&T Wind farm - 252MW
Mountainous Development Wind Power Plant - 50MW
Central Highlands Processing Wind Power Plant - 50MW
AMI Savannakhet Wind Power Plant - Laos - 252MW
Truong Son Wind Power Plant - Laos - 250MW
Customer: B&T Wind Power Joint Stock Company
Project: B&T Wind Farm (B&T1 and B&T2) - 252MW
Capacity: 252 MWp
Scope of work:
-Consulting on the preparation of feasibility study reports, basic design, specialized agreements and licensing of transmission lines and substations
-Consulting on the preparation of feasibility study reports, basic design, specialized agreements and licensing of wind power plants
Location: Quang Ninh District, Quang Binh Province, Vietnam
Customer: Chu Prong Gia Lai Wind Power Joint Stock Company
Project: Mountainous Development Wind Power Plant - 50MW
Capacity: 50MW
Location: Ngoc Hien District, Ca Mau Province
Customer: Chu Prong Gia Lai Wind Energy Joint Stock Company
Project: Central Highlands Processing Wind Power Plant - 50MW
Capacity: 50MW
Location: Ninh Thuan province
Customer: AMI Renewables Quang Binh Investment Joint Stock Company
Project: AMI Savannakhet Wind Power Plant - Laos - 252MW
Capacity: 252MW
Location: Laos
Customer: Viet Lao Energy Investment and Development Joint Stock Company
Project: Truong Son Wind Power Plant - Laos - 250MW
Capacity: 250MW
Location: Laos
Son La Hydroelectric Power Plant, 2400MW
Hoa Binh Hydroelectric Power Plant, 1920MW
Lai Chau Hydroelectric Power Plant, 1200MW
Bac Me Hydroelectric Power Plant, 45MW
Project: Son La Hydroelectric Power Plant
Capacity: 2400 MW
Scope of Work: SCADA system TKKT agreement and supply/installation of IEC 101/104 protocol conversion system
Location: Son La Province
Project: Hoa Binh Hydroelectric Power Plant
Capacity: 1920 MW
Scope of Work: Supply of SCADA system for production operation management
Location: Hoa Binh Province
Project: Lai Chau Hydroelectric Power Plant
Capacity: 1200 MW
Scope of Work: SCADA system TKKT agreement and supply/installation of IEC 101/104 protocol conversion system
Location: Lai Chau Province
Project: Bac Me Hydroelectric Power Plant
Capacity: 45 MW
Scope of Work: Preparation of documentation and application for automatic protection relay Role agreement
Location: Bac Me District, Ha Giang Province
Phu Tho Waste-to-Energy Plant, 18MW
Hau Giang Waste-to-Energy Plant, 12MW
Tay Ninh Waste-to-Energy Plant, 6MW
Client: Northern Electric Power Joint Stock Company
Project: Phu Tho Waste-to-Energy Plant
Capacity: 18 MW
Location: Phu Tho Province
Client: Hau Giang Greenity Co., Ltd.
Project: Hau Giang Waste-to-Energy Plant
Capacity: 12 MW
Location: Hau Giang Province
Client: Tay Ninh Environmental Technology Joint Stock Company
Project: Tay Ninh Waste-to-Energy Plant
Capacity: 6 MW
Location: Tay Province
Long Tao Hydroelectric Power Plant
Thanh Son Hydroelectric Power Plant
Soc Son Waste-to-Energy Plant
Cau Dat Wind Power Plant
Project: Long Tao Hydroelectric Power Plant
Scope of Work: Preparation of documentation and application for automatic protection relay Role agreement, SCADA system for the plant
Location: Dien Bien Province, Vietnam
Project: Thanh Son Hydroelectric Power Plant
Scope of Work: Preparation of documentation and application for automatic protection relay Role agreement
Location: Quan Hoa District, Thanh Hoa Province, Vietnam
Project: Soc Son Waste-to-Energy Plant
Scope of Work: Consulting for the preparation of substation and 110kV power transmission line feasibility study report
Location: Nam Son District, Hanoi, Vietnam
Project: Cau Dat Wind Power Plant
Scope of Work: Consulting for the preparation of grid connection agreement documentation
Location: Cau Dat District, Da Lat, Vietnam
Xuan Tho Solar Power Plant 1,2
Hau Giang Solar Power Plant
Ninh Thuan Provincial Power Grid
Gia Lai Provincial Power Grid
Project: Xuan Tho 1, 2 Solar Power Plant
Customer: EPCO Power
Scope of Work: Assess the power evacuation capability of the project area's power grid and forecast potential power curtailment of the plant
Location: Phu Yen Province, Vietnam
Project: Hau Giang Solar Power Plant
Scope of Work: Assess the power evacuation capability of the project area's power grid and forecast potential power curtailment of the plant
Location: Hau Giang Province, Vietnam
Project: Ninh Thuan Provincial Power Grid
Customer: DNV Singapore
Scope of Work: Evaluate the current and future status of the Ninh Thuan provincial power grid. Assess potential power curtailment scenarios for new projects connecting to the Ninh Thuan power grid
Location: Ninh Thuan Province, Vietnam
Project: Gia Lai Provincial Power Grid
Customer: DNV Singapore
Scope of Work: Evaluate the current situation of the Gia Lai provincial power grid and propose connection solutions for wind power projects
Location: Gia Lai Province, Vietnam
Turbine - Generrator 7MW
AMI Khanh Hoa Solar Power Plant
AMI BMT Solar Power Plant
Hoa Binh Hydroelectric Power Plant
Son La Hydroelectric Power Plant
Project: Turbine - Generrator 7MW
Location: 333 Sugar Company, Dac Lac Province
Project: AMI Solar Power Plant Khanh Hoa
Scope of work: Supply, installation, testing, acceptance testing of data collection and command control system DIM
Location: Khanh Hoa Province
Project: AMI BMT Solar Power Plant
Scope of work: Supply, installation, testing, acceptance testing of data collection and command control system DIM
Location: Krông Pắk District, Đắk Lắk Province
Project: Hoa Binh Hydroelectric Power Plant
Scope of work: Supply SCADA gateway equipment and control monitoring interface for operational management
Location: Hoa Binh Province
Project: Son La Hydropower Plant
Scope of work: Supply of IEC 60870-5-101 to IEC 60870-5-104 Protocol Conversion Equipment
Location: Son La Province
VINTEG prides itself as a reputable, professional, and quality-focused consultancy firm catering to the needs of renewable energy transformation.
VINTEG Joint Stock Company was established in 2015 under Business Registration Certificate No. 0107160020 issued by the Hanoi Department of Planning and Investment on December 4, 2015, and amended for the fifth time on February 14, 2020.
info@vinteg.com.vn
C32-19, Geleximco Le Trong Tan, Duong Noi Ward, Ha Dong District, Hanoi City, Vietnam
C1.05, Tower C, The Galleria Residence, 20 Nguyen Thien Thanh Street, Thu Thiem Ward, Ho Chi Minh City, Vietnam