
Bt1 Wind Farm
Establish FS, technical design for whole plant include 220kV substation, transmission line and power plant Implementation of related specialized agreements such as SCADA, relay protection, measurement… Verify the construction drawings
Establish FS, technical design for whole plant include 220kV substation, transmission line and power plant Implementation of related specialized agreements such as SCADA, relay protection, measurement… Verify the construction drawings
Establish FS, basic design and technical design for whole plant include 220kV substation and power plan Implementation of related specialized agreements such as SCADA, relay protection, measurement.. Imlement the construction drawings for substation
Scope of work: Preparation of financial statements, TKCS documents for the entire project including 220kV substation, line and plant.
Scope of work: Preparation of financial statements, TKCS documents for the entire project including 220kV substation, line and plant
Scope of work: – Implement related specialized agreements: SCADA, Role, metering
Scope of work: Design of the power system of the project of Construction and business of infrastructure of Yen Lenh – Duy Tien Industrial Cluster, Ha Nam
Scope of work: – Prepare TKKT documents for the whole project including 110kV substation, line and factory – Design construction design drawings for substation
Scope of work: – Prepare TKKT documents for the whole project including 110kV substation, line and factory – Design construction design drawings for substation
Scope of work: -Prepare documents for the entire project including 220kV substation, line and plant -Implement relevant specialized agreements: SCADA, Role, metering, etc. -Approve construction design drawings
Scope of work: -Prepare documents for the entire project including 220kV substation, line and plant -Implement relevant specialized agreements: SCADA, Role, metering, etc. -Approve construction design drawings
Recognizing the negative impacts and vulnerability caused by climate change, managers have recently implemented various guidelines, policies, laws, and measures to effectively respond to climate change and ensure sustainable development. This has particularly focused on the energy sector. In December 2022, Vietnam participated in the Just Energy Transition Partnership (JETP).
Electricity Magazine introduces readers to an overview of the potential and development stages of hydropower in Vietnam. Hydropower Potential Due to Vietnam’s geographical location within the tropical climate zone with high humidity and abundant rainfall, the country possesses a relatively large hydropower resource. The terrain stretches from north to south
China has recently marked a significant leap forward in the electricity transmission sector with the completion of the 800 kilovolt UHVDC Baihetan – Jiangsu project on May 20, 2022. Implemented by the State Grid Jiangsu Electric Power Company (SGJEPC), this project spans 2,080 kilometers, transmitting power from the Baihetan Hydroelectric
VINTEG prides itself as a reputable, professional, and quality-focused consultancy firm catering to the needs of renewable energy transformation.
VINTEG Joint Stock Company was established in 2015 under Business Registration Certificate No. 0107160020 issued by the Hanoi Department of Planning and Investment on December 4, 2015, and amended for the fifth time on February 14, 2020.
info@vinteg.com.vn
C32-19, Geleximco Le Trong Tan, Duong Noi Ward, Ha Dong District, Hanoi City, Vietnam
C1.05, Tower C, The Galleria Residence, 20 Nguyen Thien Thanh Street, Thu Thiem Ward, Ho Chi Minh City, Vietnam