Thuan Minh 2 Solar Power Plant, 50MWp
Client: Truong Thanh SD Joint Stock Company Project: Thuan Minh 2 Solar Power Plant, 50MWp Capacity: 50MWp Scope of work: Location: Ham Thuan Bac district, Binh Thuan province
Client: Truong Thanh SD Joint Stock Company Project: Thuan Minh 2 Solar Power Plant, 50MWp Capacity: 50MWp Scope of work: Location: Ham Thuan Bac district, Binh Thuan province
Client: Vietnam-Oman Invesment., JSC
Scope of work: – Supply insulating accessories, standing porcelain for 220kV substation. – Supply of protection relays and BCUs for 220kV substation expansion compartments
Scope of work: -Supply, installation, testing, acceptance of collection systemMetering data and DIM electronic dispatching command management system
Project: B&T Quang Binh Solar Power Plant Capacity: 40MWp Scope of work: – Prepare additional dossiers of planning and plans to connect the plant to the power grid Location: Quang Binh province
Customer: GAP Cam Xuyen Joint Stock Company Project: Cam Hung Solar Power Plant Capacity: 29MWp Scope of work: -Apply for an electricity activity license -Prepare the operation coordination process, Troubleshooting process -Prepare shock power-up dossiers, first-time power-up dossiers -Prepare dossiers for COD recognition -COD testing Location: Khanh Hoa province
Project: Solar Park Solar Power Plant Capacity: 625+50+100+100MWp Scope of work: – Consulting on preparing FS documents for projects – Documenting specialized agreements Location: Long An province
Client: KN Cam Lam Solar Power Joint Stock Company Project: KN Cam Lam Solar Power Plant Capacity: 50MW Scope of work: -Apply for an electricity activity license -Prepare the operation coordination process, Troubleshooting process -Prepare the shock power supply dossier, the first power supply dossier – Prepare the COD recognition
Client: Thinh Long Solar Power Joint Stock Company Project: Thinh Long AAA Solar Power Plant Capacity: 50MWp Scope of work: -Apply for an electricity activity license -Prepare the operation coordination process, Troubleshooting process -Prepare shock power-up dossiers, first-time power-up dossiers -Prepare dossiers for COD recognition -COD testing Location: Phu Yen
Customer: TA Solar Co., Ltd. Project: Da Bac 2 & 3 Solar Power Plant Capacity: 61&50MWp Scope of work: -Apply for an electricity activity license – Prepare the operation coordination process, Troubleshooting process – Prepare the shock power supply dossier, the first power supply dossier – Prepare the COD recognition
Recognizing the negative impacts and vulnerability caused by climate change, managers have recently implemented various guidelines, policies, laws, and measures to effectively respond to climate change and ensure sustainable development. This has particularly focused on the energy sector. In December 2022, Vietnam participated in the Just Energy Transition Partnership (JETP).
Electricity Magazine introduces readers to an overview of the potential and development stages of hydropower in Vietnam. Hydropower Potential Due to Vietnam’s geographical location within the tropical climate zone with high humidity and abundant rainfall, the country possesses a relatively large hydropower resource. The terrain stretches from north to south
China has recently marked a significant leap forward in the electricity transmission sector with the completion of the 800 kilovolt UHVDC Baihetan – Jiangsu project on May 20, 2022. Implemented by the State Grid Jiangsu Electric Power Company (SGJEPC), this project spans 2,080 kilometers, transmitting power from the Baihetan Hydroelectric
VINTEG prides itself as a reputable, professional, and quality-focused consultancy firm catering to the needs of renewable energy transformation.
VINTEG Joint Stock Company was established in 2015 under Business Registration Certificate No. 0107160020 issued by the Hanoi Department of Planning and Investment on December 4, 2015, and amended for the fifth time on February 14, 2020.
info@vinteg.com
C1.05 – 1st Floor, Tower C, The Galleria Residence, 20 Nguyen Thien Thanh Street, Thu Thiem Ward, Thu Duc, Ho Chi Minh City
C32-BTSL3, Plot No. 19, New Urban Area on both sides of Le Trong Tan Street, Duong Noi Ward, Ha Dong District, Hanoi City.