Lai Chau Hydropower Plant, 1200MW
Project: Thanh Son Hydropower Plant Capacity: 30MW Scope of work: Prepare documents and apply for approval of automatic protection role agreements Location: Thanh Hoa province
Project: Thanh Son Hydropower Plant Capacity: 30MW Scope of work: Prepare documents and apply for approval of automatic protection role agreements Location: Thanh Hoa province
Project: Son La Hydropower Plant Capacity: 2400MW Scope of work: SCADA system TKKT agreement and supply and installation of IEC 101/104 protocol dual transfer system. Location: Son La province
Project: Hoa Binh Hydropower Plant Capacity: 1920MW Scope of work: Supply of SCADA system for production operation management Location: Hoa Binh province
Project: Ngoi Phat 2 Hydropower Plant Capacity: 12MW Scope of work: Preparing documents and applying for approval of automatic protection role agreements, SCADA/EMS Location: Lao Cai province
Project: Bac Me Hydropower Plant Capacity: 45MW Scope of work: Prepare documents and apply for approval of automatic protection role agreements Location: Ha Giang province
Project: Thanh Son Hydropower Plant Capacity: 30MW Scope of work: Prepare documents and apply for approval of automatic protection role agreements Location: Thanh Hoa province
Recognizing the negative impacts and vulnerability caused by climate change, managers have recently implemented various guidelines, policies, laws, and measures to effectively respond to climate change and ensure sustainable development. This has particularly focused on the energy sector. In December 2022, Vietnam participated in the Just Energy Transition Partnership (JETP).
Electricity Magazine introduces readers to an overview of the potential and development stages of hydropower in Vietnam. Hydropower Potential Due to Vietnam’s geographical location within the tropical climate zone with high humidity and abundant rainfall, the country possesses a relatively large hydropower resource. The terrain stretches from north to south
China has recently marked a significant leap forward in the electricity transmission sector with the completion of the 800 kilovolt UHVDC Baihetan – Jiangsu project on May 20, 2022. Implemented by the State Grid Jiangsu Electric Power Company (SGJEPC), this project spans 2,080 kilometers, transmitting power from the Baihetan Hydroelectric
VINTEG prides itself as a reputable, professional, and quality-focused consultancy firm catering to the needs of renewable energy transformation.
VINTEG Joint Stock Company was established in 2015 under Business Registration Certificate No. 0107160020 issued by the Hanoi Department of Planning and Investment on December 4, 2015, and amended for the fifth time on February 14, 2020.
info@vinteg.com
C1.05 – 1st Floor, Tower C, The Galleria Residence, 20 Nguyen Thien Thanh Street, Thu Thiem Ward, Thu Duc, Ho Chi Minh City
C32-BTSL3, Plot No. 19, New Urban Area on both sides of Le Trong Tan Street, Duong Noi Ward, Ha Dong District, Hanoi City.