Sugarcane Factory 333
Scope of work: -Supply turbine system – 7MW generator. – Supply of SCADA system to monitor the boiler system 60 tons/h.
Scope of work: -Supply turbine system – 7MW generator. – Supply of SCADA system to monitor the boiler system 60 tons/h.
Scope of work: -Supply turbine system – 7MW generator. – Supply of SCADA system to monitor the boiler system 60 tons/h.
Scope of work: -Supply of IEC 60870-5-101 to IEC 60870-5-104 protocol conversion equipment. -Perform technical tests related to A0/Ax
Scope of work: -Supply of IEC 60870-5-101 to IEC 60870-5-104 protocol conversion equipment – Carry out technical tests related to A0/Ax.
Scope of work: Providing SCADA gateway devices and control monitoring interfaces for operation management – Providing information security patching equipment
Scope of work: Supply, installation, testing, acceptance of the metering data collection system and DIM electronic dispatching order management system
Scope of work: Supply, installation, testing, acceptance of the metering data collection system and DIM electronic dispatching order management system
Scope of work: – Technical appraisal and evaluation of Bung 4A river hydropower project in Quang Nam Customer: DNV Singapore Pte.Ltd
Recognizing the negative impacts and vulnerability caused by climate change, managers have recently implemented various guidelines, policies, laws, and measures to effectively respond to climate change and ensure sustainable development. This has particularly focused on the energy sector. In December 2022, Vietnam participated in the Just Energy Transition Partnership (JETP).
Electricity Magazine introduces readers to an overview of the potential and development stages of hydropower in Vietnam. Hydropower Potential Due to Vietnam’s geographical location within the tropical climate zone with high humidity and abundant rainfall, the country possesses a relatively large hydropower resource. The terrain stretches from north to south
China has recently marked a significant leap forward in the electricity transmission sector with the completion of the 800 kilovolt UHVDC Baihetan – Jiangsu project on May 20, 2022. Implemented by the State Grid Jiangsu Electric Power Company (SGJEPC), this project spans 2,080 kilometers, transmitting power from the Baihetan Hydroelectric
VINTEG prides itself as a reputable, professional, and quality-focused consultancy firm catering to the needs of renewable energy transformation.
VINTEG Joint Stock Company was established in 2015 under Business Registration Certificate No. 0107160020 issued by the Hanoi Department of Planning and Investment on December 4, 2015, and amended for the fifth time on February 14, 2020.
info@vinteg.com
C1.05 – 1st Floor, Tower C, The Galleria Residence, 20 Nguyen Thien Thanh Street, Thu Thiem Ward, Thu Duc, Ho Chi Minh City
C32-BTSL3, Plot No. 19, New Urban Area on both sides of Le Trong Tan Street, Duong Noi Ward, Ha Dong District, Hanoi City.