Establish FS, technical design for whole plant include 220kV substation, transmission line and power plant
Implementation of related specialized agreements such as SCADA, relay protection, measurement…
Verify the construction drawings
Establish FS, technical design for whole plant include 220kV substation, transmission line and power plant
Implementation of related specialized agreements such as SCADA, relay protection, measurement…
Verify the construction drawings
Establish FS, technical design for whole plant include 220kV substation, transmission line and power plant Implementation of related specialized agreements such as SCADA, relay protection, measurement… Verify the construction drawings
VINTEG prides itself as a reputable, professional, and quality-focused consultancy firm catering to the needs of renewable energy transformation.
VINTEG Joint Stock Company was established in 2015 under Business Registration Certificate No. 0107160020 issued by the Hanoi Department of Planning and Investment on December 4, 2015, and amended for the fifth time on February 14, 2020.
info@vinteg.com.vn
C32-19, Geleximco Le Trong Tan, Duong Noi Ward, Ha Dong District, Hanoi City, Vietnam
C1.05, Tower C, The Galleria Residence, 20 Nguyen Thien Thanh Street, Thu Thiem Ward, Ho Chi Minh City, Vietnam